Langley Station Platform Extension

Langley Station Platform Extension

TSP Projects were engaged as Principal Contractor to carry out the GRIP 5-8 works for a 90 metre extension of Platform 1 at Langley Station. The site had limited access, with only a footbridge and walkway to the existing platform which was located on an embankment....